Our team supported the reconstruction of 89 miles of single and three-phase distribution lines.
A total of seventy-four 7.2/12.5kV and 14.4/24.9kV RUS distribution work plan projects including both overhead and underground circuits along with FTTH are included throughout Great Lakes Energy’s nine service areas. Several line sections are being relocated from deep right-of-way to the edge of roadways or converted to underground.
Project Features
- Distribution line design
- Right-of-way Procurement Assistance
- MDOT, MDNR, USFS, & Road Commission Permitting
- Staking sheet preparation
- Construction drawings
- RUS 790 Contract documents
- Material procurement
- Construction staking & observation
- Inspection for RUS219 approval
- RUS Closeout documentation