Verdantas is supporting the City of Nashua in meeting FERC and other agency requirements at the Mine Falls and Jackson Mills hydroelectric facilities on the Nashua River. Our hydropower engineering and fish passage work includes upstream and downstream fish passage analysis and design, environmental studies, LiDAR and bathymetry, site investigations, and regulatory coordination and agency consultation at both facilities.
At Mine Falls, Verdantas is and will be conducting FERC and other agency compliance studies including, water quality, fish stranding, upstream eel passage, and fish passage effectiveness, along with the evaluation and preliminary design of downstream fish passage alternatives. At Jackson Mills, Verdantas conducted water quality and fish stranding studies, evaluated upstream and downstream fish passage alternatives, with replacement of the existing Denil fish ladder selected to advance through final design for upstream passage.
As the Jackson Mills design advances, Verdantas is using computational fluid dynamics (CFD) modeling to evaluate and refine flow conditions in and around the Denil fish ladder and near the hydropower intake. The modeling provides detailed insight into hydraulic conditions that can inform design decisions as improvements progress through the 30%, 90%, and final design stages. Upstream and downstream passage features are being coordinated at each milestone to create an integrated fish passage design.
Site-specific data collection is also informing work at both facilities. Verdantas performed bathymetric and LiDAR surveys at Mine Falls and Jackson Mills to establish current baseline conditions for detailed upstream and downstream fish passage design.
Together, the work combines hydraulic and CFD modeling, fish passage engineering, biological considerations, field data, and regulatory coordination to help the City of Nashua advance fish passage improvements tailored to the unique conditions at each hydroelectric facility.
Project Highlights
- Upstream and downstream fish passage analysis and design
- CFD modeling of the Jackson Mills Denil fish ladder and downstream bypass
- Jackson Mills fish passage improvements conceptual design advanced through 30%, 90%, and final design
- Bathymetric and LiDAR surveys supporting detailed design at both facilities
- Environmental studies to support FERC compliance
- Environmental studies and regulatory coordination supporting FERC and agency requirements
Solution
River and Flow-Related Solutions
Expertise
Hydrology, Hydraulics, & Fluids
Natural Resources & Environmental Planning
Market
Client
City of Nashua
Location
Nashua, NH