Verdantas spearheaded the development of a project featuring a new 0.5-MG prestressed AWWA D-110 concrete reservoir alongside onsite vaults, site grading, an access road, and 15,000 feet of transmission main, navigating through various terrain, including creek and canal crossings and steep slopes. Our comprehensive solutions encompass reservoir siting, transmission main routing, water line and access easements, environmental assessment, wetland determination, and permitting.
Verdantas facilitated seamless coordination among survey, environmental, structural, civil, and electrical teams, fostering collaboration and alignment with the District’s objectives. Our proactive approach involved continuous stakeholder engagement and incorporating valuable feedback to maintain a cohesive design concept. We addressed concerns promptly and implemented changes to optimize value or mitigate risks for the District, thereby ensuring project success.
Project Features:
- Federal/State Funding
- Concrete Reservoir
- Transmission Main
- Easements
- Environmental Assessment
- Wetland Determination
- Permitting
Solution
Expertise
Water & Wastewater Systems Engineering
Market
Client
Crystal Springs Water District
Location
Odell, OR